This section is for SatCure customers only. If you are not yet a customer, please show your gratitude by buying an eBook or a physical product from us.

Technical Section

Send this page address - CLICK HERE - to a friend !

Triax A18QR aerial assembly

First join the two square-section aerial rods together using the joining clamp with two bolts and wing nuts.

Fit the connection box at the end shown by aligning the plastic peg in its moulded channel with the hole in the aerial rod. Press the moulded box firmly over the square-section rod and increase pressure until it snaps into place.

Now take the two angled mouldings with three bolts and wing nuts. Use these to clamp together the two reflector grids and secure them to the end of the aerial behind the connection box.

Fit the "U" shaped support tube to the underside of the aerial, ensuring that it is positioned as indicated (left arrow).

Fit the mast clamp assembly to the support tube using the small metal bridge and fixing it to the circular cup section with two screws provided.

Before tightening, hang the aerial with your finger beneath the cup section and ensure that it's positioned at the point of balance.

This is the finished aerial mounted on a pole

Send this page address - CLICK HERE - to a friend !

Copyright ©2003 Martin Pickering
Version 1.0 updated on February 28, 2003
This file may be downloaded for private and personal use but NO part of it may be published in any form without the prior permission of the author.

This Web Site was produced entirely on a Macintosh computer